M. Boccas,1 E. Diaz,1 M. Frantz,1 S. Gonzalez,1 G. Hüdepohl,1 I. Kastinen,1 V. Nurzia,1 P. Pozzobon,1 C. Ramirez,1 C. Reinero,1 F. Salgado,1 C. Stephan,1 J. Valenzuela1
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.
After 20 years of operations, the Paranal Observatory has accumulated some experience with maintenance of systems, and has lately adopted the methodology called ‘Maintien en Condition Operationnelle’ (MCO). We will describe and review the practical implementation of this strategy, the tools used, the benefits and challenges as well as practical examples and how it is overall managed. The approach is also a benchmarking exercise for operation of the ESO-ELT in the future.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.
The alert did not successfully save. Please try again later.
M. Boccas, E. Diaz, M. Frantz, S. Gonzalez, G. Hüdepohl, I. Kastinen, V. Nurzia, P. Pozzobon, C. Ramirez, C. Reinero, F. Salgado, C. Stephan, J. Valenzuela, "Technical operations and maintenance activities at the Paranal Observatory," Proc. SPIE 10704, Observatory Operations: Strategies, Processes, and Systems VII, 107041Y (10 July 2018); https://doi.org/10.1117/12.2311769