13 May 2024 Design of sludge lancing equipment for HPR1000 steam generator
Xunzong Yang, Weirang Wu, Junfei Wang, Tong Yu
Author Affiliations +
Proceedings Volume 13159, Eighth International Conference on Energy System, Electricity, and Power (ESEP 2023); 131599Q (2024) https://doi.org/10.1117/12.3024749
Event: Eighth International Conference on Energy System, Electricity and Power (ESEP 2023), 2023, Wuhan, China
Abstract
The third-generation nuclear power unit has become the mainstream of construction of nuclear power plants worldwide. According to the historical operation experience, for vertical natural circulation steam generators, deposits on the upper surface of tubesheet must be removed during the outage to prevent the excessive accumulation of deposits (sludge) from triggering problems such as degradation and breakage of the tubes. Based on the HPR1000 unit BWC-97 steam generator, this paper describes high-efficiency automatic hydro-lancing equipment design scheme, including the design principle analysis, distributed control system design, hydraulic parameters calculations and other content. Field application shows that the design scheme can meet the actual needs of steam generator lancing during the outage of the HPR1000 units, and has further application value for third-generation nuclear power units.
(2024) Published by SPIE. Downloading of the abstract is permitted for personal use only.
Xunzong Yang, Weirang Wu, Junfei Wang, and Tong Yu "Design of sludge lancing equipment for HPR1000 steam generator", Proc. SPIE 13159, Eighth International Conference on Energy System, Electricity, and Power (ESEP 2023), 131599Q (13 May 2024); https://doi.org/10.1117/12.3024749
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Design

Actuators

Control systems

Nozzles

Control systems design

Photonic integrated circuits

Inspection

Back to Top