Paper
13 October 2000 Advanced order management in ERM systems: the tic-tac-toe algorithm
Mariana Badell, Elena Fernandez, Luis Puigjaner
Author Affiliations +
Proceedings Volume 4192, Intelligent Systems in Design and Manufacturing III; (2000) https://doi.org/10.1117/12.403656
Event: Intelligent Systems and Smart Manufacturing, 2000, Boston, MA, United States
Abstract
The concept behind improved enterprise resource planning systems (ERP) systems is the overall integration of the whole enterprise functionality into the management systems through financial links. Converting current software into real management decision tools requires crucial changes in the current approach to ERP systems. This evolution must be able to incorporate the technological achievements both properly and in time. The exploitation phase of plants needs an open web-based environment for collaborative business-engineering with on-line schedulers. Today's short lifecycles of products and processes require sharp and finely tuned management actions that must be guided by scheduling tools. Additionally, such actions must be able to keep track of money movements related to supply chain events. Thus, the necessary outputs require financial-production integration at the scheduling level as proposed in the new approach of enterprise management systems (ERM). Within this framework, the economical analysis of the due date policy and its optimization become essential to manage dynamically realistic and optimal delivery dates with price-time trade-off during the marketing activities. In this work we propose a scheduling tool with web-based interface conducted by autonomous agents when precise economic information relative to plant and business actions and their effects are provided. It aims to attain a better arrangement of the marketing and production events in order to face the bid/bargain process during e-commerce. Additionally, management systems require real time execution and an efficient transaction-oriented approach capable to dynamically adopt realistic and optimal actions to support marketing management. To this end the TicTacToe algorithm provides sequence optimization with acceptable tolerances in realistic time.
© (2000) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Mariana Badell, Elena Fernandez, and Luis Puigjaner "Advanced order management in ERM systems: the tic-tac-toe algorithm", Proc. SPIE 4192, Intelligent Systems in Design and Manufacturing III, (13 October 2000); https://doi.org/10.1117/12.403656
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Chemical elements

Manufacturing

Head

Optimization (mathematics)

Lead

Computing systems

Interfaces

RELATED CONTENT

Methodology for optimizing supply chains
Proceedings of SPIE (May 17 2022)
Design of optimized piezoelectric HDD-sliders
Proceedings of SPIE (April 09 2010)
Experience with EFQM assessment at Siemens Mask Shop
Proceedings of SPIE (April 23 1999)
Multilingual mapping based on XML-SVG
Proceedings of SPIE (November 03 2008)

Back to Top