30 June 2006 Planning and scheduling of the Hubble Space Telescope in the 2-gyro regime
David S. Adler, Tricia Royle, William W. Workman III, Denise C. Taylor
Author Affiliations +
Abstract
In order to maximize the useful life of the remaining operational gyroscopes and extend the life of the mission, the Hubble Space Telescope began 2-Gyro observations in the summer of 2005. The operational switch had implications for the planning and scheduling of the telescope; those issues are discussed here. In addition, we present an analysis of the resulting scheduling rates and telescope efficiency.
© (2006) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
David S. Adler, Tricia Royle, William W. Workman III, and Denise C. Taylor "Planning and scheduling of the Hubble Space Telescope in the 2-gyro regime", Proc. SPIE 6270, Observatory Operations: Strategies, Processes, and Systems, 62700Y (30 June 2006); https://doi.org/10.1117/12.669495
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Stars

Visibility

Telescopes

Gyroscopes

Space telescopes

Hubble Space Telescope

Space operations

Back to Top