The Large Synoptic Survey Telescope (LSST) Telescope integration and test plan is phased to ensure that subsystems and services are available to support the integration flow. It begins with the summit facility construction and shows how the major subsystems feed into the activities through final testing. In order to minimize the amount of hardware mated for the first time during that period, the approach is to favor all hardware mated and pre-tested at vendors’ facilities with associated hardware and software prior to delivery onsite. The integration and test plan exploits the diffraction limited on-axis image quality of the three-mirror design. In addition, fiducials will be used during optical acceptance testing at vendors’ facilities to capture the optical axis geometry of each optical element. These fiducials will be used during the integration and tests sequence to facilitate the telescope optical alignment. In this paper, we describe the major steps of the LSST telescope integration and test sequence prior to the start of commissioning with the science camera.
© (2014) COPYRIGHT Society of Photo-Optical Instrumentation Engineers (SPIE). Downloading of the abstract is permitted for personal use only.
Jacques Sebag, William Gressler, Doug Neill, Jeff Barr, Chuck Claver, and John Andrew "LSST telescope integration and tests", Proc. SPIE 9145, Ground-based and Airborne Telescopes V, 91454A (22 July 2014); https://doi.org/10.1117/12.2055241
Lens.org Logo
CITATIONS
Cited by 4 scholarly publications.
Advertisement
Advertisement
RIGHTS & PERMISSIONS
Get copyright permission  Get copyright permission on Copyright Marketplace
KEYWORDS
Mirrors

Telescopes

Cameras

Optical fabrication

Large Synoptic Survey Telescope

Coating

Domes

RELATED CONTENT

LSST Telescope and site status
Proceedings of SPIE (July 22 2014)
LSST telescope and site status
Proceedings of SPIE (July 27 2016)
LSST telescope and site status
Proceedings of SPIE (July 06 2018)
Initial alignment and commissioning plan for the LSST
Proceedings of SPIE (September 17 2012)
Optical quality of the W.M. Keck Telescope
Proceedings of SPIE (June 01 1994)

Back to Top