The METIS instrument (Mid-infrared ELT Imager and Spectrograph) is one of the three first-light instruments for the ELT. It will work in the mid-infrared with a set of four different focal planes, grouped in three different subsystems: the imager (IMG) and the spectrograph (LMS) are the two scientific focal planes, and the last one, SCAO, is the dedicated adaptive optics system. In total, this instrument requires five H2RG detectors (5.3μm cutoff), one SAPHIRA detector (2.5μm) and one GEOSNAP (13.5μm). All of these detectors will be controlled by the New General Controller, second generation (NGCII). These three separate subsystems require specific tests and development : the IMG needs a fast readout for both N and LM channels, the LMS requires a mosaic of four detectors and SCAO works with one single detector operated fast for AO corrections. In this paper, we will present the challenges for the development of the detector systems of the three detector subunits in METIS. This includes the design, tests and preparations for the AIT/AIV phases that each subsystem has to go through. First, we describe the detector-specifics of all the instruments. In a second part, we go over the design challenges for these detector subunits. In the end, we will report on the current testing.
The European Southern Observatory (ESO) is at present constructing the Extremely Large Telescope (ELT), a 40-m class astronomical telescope on top of the 3046 m high mountain Cerro Armazones in the central part of Chile’s Atacama Desert. In combination with its powerful facility instruments, it will be the largest optical/near-infrared telescope in the world, also known as the biggest eye on the sky. The instrument roadmap lists up to eight scientific instruments, whereof the first light instruments were already completing their final design phase. Nowadays massive instruments, each weighing about 20 to 40 tons, are requiring powerful cryogenic systems for cooling the cold mass of several tons of each individual instrument.
The paper outlines the cryogenic requirements defined by the ELT instrument suite and describes concept and design of the cryogenic infrastructure. A centralized and fully automated system combining open loop Liquid Nitrogen cooling in combination with low-vibration mechanical cryo-coolers is the baseline for providing the required cooling capacity and temperature levels as low as 4 Kelvin. Project status and timeline are presented.
HARMONI is the first light visible and near-IR integral field spectrograph for the ELT. It covers a large spectral range from 450 nm to 2450 nm with resolving powers from 3500 to 18000 and spatial sampling from 60 mas to 4 mas. It can operate in two Adaptive Optics modes - SCAO (including a High Contrast capability) and LTAO - or with NOAO. The project is preparing for Final Design Reviews. HARMONI is a work-horse instrument that provides efficient, spatially resolved spectroscopy of extended objects or crowded fields of view. The gigantic leap in sensitivity and spatial resolution that HARMONI at the ELT will enable promises to transform the landscape in observational astrophysics in the coming decade. The project has undergone some key changes to the leadership and management structure over the last two years. We present the salient elements of the project restructuring, and modifications to the technical specifications. The instrument design is very mature in the lead up to the final design review. In this paper, we provide an overview of the instrument's capabilities, details of recent technical changes during the red flag period, and an update of sensitivities.
SOXS (Son Of X-Shooter) is the new ESO instrument that is going to be installed on the 3.58-m New Technology Telescope at the La Silla Observatory. SOXS is a single object spectrograph offering a wide simultaneous spectral coverage from U- to H-band. Although such an instrument may have potentially a large variety of applications, the consortium designed it with a clear science case: it is going to provide the spectroscopic counterparts to the ongoing and upcoming imaging surveys, becoming one of the main follow-up instruments in the Southern hemisphere for the classification and characterization of transients. The NTT+SOXS system is specialized to observe all transients and variable sources discovered by imaging surveys with a flexible schedule maintained by the consortium, based on a remote scheduler which will interface with the observatory software infrastructure. SOXS is realized timely to be highly synergic with transients discovery machines like the Vera C. Rubin Observatory. The instrument has been integrated and tested in Italy, collecting and assembling subsystems coming from all partners spread over six countries in three continents. The first preparatory activities in Chile have been completed at the telescope. This article gives an updated status of the project before the shipping of the instrument to Chile.
The SOXS spectrograph, designed for the ESO NTT telescope, operates in both the optical (UV-VIS: 350-850 nm) and NIR (800-2000 nm) bands. This article provides an overview of the final tests conducted on the UV-VIS camera system using a telescope simulator. It details the system’s performance evaluation, including key metrics such as gain, readout noise, and linearity, and highlights the advancements made in the upgraded acquisition system. The testing process, conducted in the Padua laboratory, involved comprehensive simulations of the telescope environment to ensure the results closely resemble those expected at the ESO-NTT telescope. The successful completion of these tests confirms the system’s readiness for deployment to Chile, where it will be installed on the NTT telescope, marking a significant milestone in the SOXS project.
The Son Of X-Shooter (SOXS) is a single object spectrograph, built by an international consortium for the 3.58-m ESO New Technology Telescope at the La Silla Observatory. It offers a simultaneous spectral coverage over 350-2000 nm, with two separate spectrographs. In this paper we present the status of the Near InfraRed (NIR) cryogenic echelle cross-dispersed spectrograph, in the range 0.80-2.00 μm with 15 orders, equipped with an 2k x 2k Hawaii H2RG IR array from Teledyne, working at 40K, that is currently assembled and tested on the SOXS instrument, in the premises of INAF in Padova. We describe the different tests and results of the cryo, vacuum, opto-mechanics and detector subsystems that finally will be part of the PAE by ESO.
REMIR is a NIR camera mounted on the REM telescope at ESO-La Silla Observatory. Soon after its installation in 2003, the REMIR camera went through a series of cryogenics problems, due to the bad functioning of the Leybold cryocooler Polar SC7 and we were forced to change drastically the cryogenics of REMIR, going from cryocooler to LN2, via an ad-hoc modified Continuos Flow Criostat, a cryogenics system developed by ESO. Today, the availability of new generation small cryocoolers, in our case the Sunpower CryoTel GT AVC, allowed us to change again and come back to the original cryogenics for the REMIR camera. The system has been assembled and intensively tested at ESO and at INAF-OAR premises, then it has been mounted on the REMIR camera and tested at working condition. In this paper we report the details and results of the project.
HARMONI is the first light, adaptive optics assisted, integral field spectrograph for the European Southern Observatory’s Extremely Large Telescope (ELT). A work-horse instrument, it provides the ELT’s diffraction limited spectroscopic capability across the near-infrared wavelength range. HARMONI will exploit the ELT’s unique combination of exquisite spatial resolution and enormous collecting area, enabling transformational science. The design of the instrument is being finalized, and the plans for assembly, integration and testing are being detailed. We present an overview of the instrument’s capabilities from a user perspective, and provide a summary of the instrument’s design. We also include recent changes to the project, both technical and programmatic, that have resulted from red-flag actions. Finally, we outline some of the simulated HARMONI observations currently being analyzed.
SOXS (Son Of X-Shooter) is a single object spectrograph offering a simultaneous spectral coverage from U- to H-band, built by an international consortium for the 3.58-m ESO New Technology Telescope at the La Silla Observatory. It is designed to observe all kind of transients and variable sources discovered by different surveys with a highly flexible schedule maintained by the consortium, based on the Target of Opportunity concept. SOXS is going to be a fundamental spectroscopic partner for any kind of imaging survey, becoming one of the premier transient follow-up instruments in the Southern hemisphere. This paper gives an updated status of the project, when the instrument is in the advanced phase of integration and testing in Europe, prior to the activities in Chile.
CRIRES+ extended the capabilities of CRIRES, the CRyogenic InfraRed Echelle Spectrograph. It transformed this VLT instrument into a cross-dispersed spectrograph to increase the wavelength range that is covered simultaneously by a factor of ten. In addition, a new detector focal plane array of three Hawaii 2RG detectors with a 5.3 μm cut-off wavelength replaced the existing detectors. Amongst many other improvements a new spectropolarimetric unit was added and the calibration system has been enhanced. The instrument was installed at the VLT on Unit Telescope 3 beginning of 2020 and successfully commissioned and verified for science operations during 2021, partly remote from Europe due to the pandemic. The instrument was subsequently offered to the community from October 2021 onwards. This article describes the performance and capabilities of this development and presents on sky results.
ESO took a systematic approach at earliest phases of the ELT programme to address different aspects of vibration at the telescope, from modelling, error budgeting, requirement specifications, to envisaging verification and mitigation methods. Recent activities focused on measuring and characterizing the vibrational forces generated by typical equipment in the observatory. In addition, the measurements are performed to design and verify the efficiency of the required isolation systems. In this paper, a complete system analysis using these measurement data as input to the detailed model of the telescope structure combined with hosted units, i.e. mirrors, instruments and other equipment, (all at final design phase) is presented. The analysis serves as a verifying tool to observe the actual state of the performance versus the top-level budget. It is also discussed how the results are used for improving the design and envisaging the potential mitigation strategies.
SOXS will be the new spectroscopic facility for the ESO NTT telescope able to cover the optical and NIR bands by using two different arms: the UV-VIS (350-850 nm), and the NIR (800-2000 nm). In this article, we describe the development status of the visible camera cryostat, the architecture of the acquisition system and the progress in the electronic design. The UV-VIS detector system is based on a CCD detector 44-82 from e2v, a custom detector head, coupled with the ESO continuous flow cryostats (CFC), a custom cooling system, based on a Programmable Logic Controller (PLC), and the New General Controller (NGC) developed by ESO. This paper outlines the development status of the system, describes the design of the different parts that make up the UV- VIS arm and is accompanied by a series of information describing the SOXS design solutions in the mechanics and in the electronics parts. The first tests of the detector system with the UV-VIS camera will be shown.
The scientific detector systems for the ESO ELT first-light instruments, HARMONI, MICADO, and METIS, together will require 27 science detectors: seventeen 2.5 μm cutoff H4RG-15 detectors, four 4K x 4K 231-84 CCDs, five 5.3 μm cutoff H2RG detectors, and one 13.5 μm cutoff GEOSNAP detector. This challenging program of scientific detector system development covers everything from designing and producing state-of-the-art detector control and readout electronics, to developing new detector characterization techniques in the lab, to performance modeling and final system verification. We report briefly on the current design of these detector systems and developments underway to meet the challenging scientific performance goals of the ELT instruments.
HARMONI is the adaptive optics assisted, near-infrared and visible light integral field spectrograph for the Extremely Large Telescope (ELT). A first light instrument, it provides the work-horse spectroscopic capability for the ELT. As the project approaches its Final Design Review milestone, the design of the instrument is being finalized, and the plans for assembly, integration and testing are being detailed. We present an overview of the instrument’s capabilities from a user perspective, provide a summary of the instrument’s design, including plans for operations and calibrations, and provide a brief glimpse of the predicted performance for a specific observing scenario. The paper also provides some details of the consortium composition and its evolution since the project commenced in 2015.
One of the critical components of the AO systems are the WFS detectors that have very challenging requirements of high Quantum Efficiency (QE), and low read noise at high read out speeds. For several years now, ESO has been very active in gathering requirements, planning, and developing detectors and controllers/cameras for the AO systems of the telescope and instruments of the ELT. There cameras are in development: ALICE, LISA and FREDA. For ALICE and LISA, a single camera design approach is being followed with the only difference being the customizable front-ends to support the different type of detector. For the FREDA camera, a different approach is being followed: C-RED One cameras are being procured from First Light Imaging and will be modified by ESO to comply with ELT standards. An update on the progress of this development and measured results of camera test will be provided.
SOXS (Son Of X-Shooter) is a single object spectrograph, characterized by offering a wide simultaneous spectral coverage from U- to H-band, built by an international consortium for the 3.6-m ESO New Technology Telescope at the La Silla Observatory, in the Southern part of the Chilean Atacama Desert. The consortium is focussed on a clear scientific goal: the spectrograph will observe all kind of transient and variable sources discovered by different surveys with a highly flexible schedule, updated daily, based on the Target of Opportunity concept. It will provide a key spectroscopic partner to any kind of imaging survey, becoming one of the premier transient follow-up instruments in the Southern hemisphere. SOXS will study a mixture of transients encompassing all distance scales and branches of astronomy, including fast alerts (such as gamma-ray bursts and gravitational waves), mid-term alerts (such as supernovae and X-ray transients), and fixed-time events (such as the close-by passage of a minor planet or exoplanets). It will also have the scope to observe active galactic nuclei and blazars, tidal disruption events, fast radio bursts, and more. Besides of the consortium programs on guaranteed time, the instrument is offered to the ESO community for any kind of astrophysical target. The project has passed the Final Design Review and is currently in manufacturing and integration phase. This paper describes the development status of the project.
HARMONI is an Integral Field Spectrograph (IFS) for ESO’s ELT. It has been selected as the first light spec- trograph and will provide the workhorse spectroscopic capabilities for the ELT for many years. HARMONI is currently at the PDR-level and the current design for the HARMONI IFS consists of a number of spaxel scales sampling down to the diffraction limit of the telescope. It uses a field splitter and image slicer to divide the field into 4 sub-units, each providing an input slit to one of four nearly identical spectrographs. All spectrographs will operate at near infrared wavelengths (0.81-2.45 micrometers), sampling different parts of the spectrum with a range of spectral resolving powers (3300, 7000, 18000). In addition, two of the four spectrographs will have a Visible capability (0.5-0.83 micrometers) operating with seeing-limited observations. This proceeding presents an overview of the opto-mechanical design and specifications of the spectrograph units for HARMONI.
The European Southern Observatory (ESO) is building the Extremely Large Telescope (ELT), a 40-m class telescope to be installed on top of the 3046 m high mountain Cerro Armazones in the central part of Chile’s Atacama Desert. Once operational the ELT will be the largest optical/near-infrared telescope in the world. Powerful facility instruments that can deliver the science cases for the ELT are under development. The instrument roadmap lists more than six scientific instruments, each of them in the 15-35 tons range. While the telescope optics operate at ambient temperature, the instrument optics structure and in particular the detectors will be cooled to cryogenic temperatures down to as low as 4 Kelvin. ESO is aiming to implement proven technologies and commercial off-the-shelf components to build the cryogenic infrastructure for the ELT instruments. A combination of open loop Liquid Nitrogen cooling and low-vibration mechanical cryo-coolers will be installed to provide the required temperature levels and cooling capacities. ESO’s vacuum and cryogenic standards required major updates in order to match with the needs and challenges of this new class of huge instruments, each of them coming with up to 50 m3 vessel volume and more than 5 tons cold mass.
The paper outlines the instruments vacuum and cryogenic requirements, gives a brief overview of the ESO vacuum and cryogenic standards, and of the ELT cryogenic infrastructure baseline concept. The current testing approach for selected standard components such as low-vibration cryo-coolers and vibration damping systems will be presented.
SOXS (Son Of X-Shooter) will be a spectrograph for the ESO NTT telescope capable to cover the optical and NIR bands, based on the heritage of the X-Shooter at the ESO-VLT. SOXS will be built and run by an international consortium, carrying out rapid and longer term Target of Opportunity requests on a variety of astronomical objects. SOXS will observe all kind of transient and variable sources from different surveys. These will be a mixture of fast alerts (e.g. gamma-ray bursts, gravitational waves, neutrino events), mid-term alerts (e.g. supernovae, X-ray transients), fixed time events (e.g. close-by passage of minor bodies). While the focus is on transients and variables, still there is a wide range of other astrophysical targets and science topics that will benefit from SOXS. The design foresees a spectrograph with a Resolution-Slit product ≈ 4500, capable of simultaneously observing over the entire band the complete spectral range from the U- to the H-band. The limiting magnitude of R~20 (1 hr at S/N~10) is suited to study transients identified from on-going imaging surveys. Light imaging capabilities in the optical band (grizy) are also envisaged to allow for multi-band photometry of the faintest transients. This paper outlines the status of the project, now in Final Design Phase.
MATISSE (Multi AperTure mid-Infrared SpectroScopic Experiment) is the spectro-interferometer for the VLTI of the European Southern Observatory, operating in near and mid-infrared, and combining up to four beams from the unit or the auxiliary telescopes. MATISSE will offer new breakthroughs in the study of circumstellar environments by allowing the multispectral mapping of the material distribution, the gas and essentially the dust.
The instrument consists in a warm optical system (WOP) accepting four optical beams and relaying them after a dichroic splitting (for the L and M- and N- spectral bands) to cold optical benches (COB) located in two separate cryostats. The Observatoire de la Côte d’Azur is in charge of the WOP providing the spectral band separation, optical path equalization and modulation, pupil positioning, beam anamorphosis, beam commutation, and calibration. NOVA-ASTRON is in charge of the COB providing the functions of beam selection, reduction of thermal background emission, spatial filtering, pupil transfer, photometry and interferometry splitting, additional beam anamorphosis, spectral filtering, polarization selection, image dispersion, and image combination. The Max Planck Institut für Radio Astronomie is in charge of the operation and performance validation of the two detectors, a HAWAII-2RG from Teledyne for the L- and M- bands and a Raytheon AQUARIUS for the N-band. Both detectors are provided by ESO. The Max Planck Institut für Astronomie is in charge of the electronics and the cryostats for which the requirements on space limitations and vibration stability resulted on very specific and stringent decisions on the design.
The integration and test of the COB: the two cryogenic systems, including the cold benches and the detectors, have been conducted at MPIA in parallel with the integration of the WOP at OCA. At the end of 2014, the complete instrument was integrated at OCA. Following this integration, a period of interface and alignment between the COB and the WOP took place resulting in the first interference fringes in the L-band during summer 2015 and the first interference fringes in the N-ban in March 2016.
After a period of optimization of both the instrument reliability and the environmental working conditions, the test plan is presently being conducted in order to evaluate the complete performance of the instrument and its compliance with the high-level requirements. The present paper gives the first results of the alignment, integration and test phase of the MATISSE instrument.
MUSE (Multi Unit Spectroscopic Explorer) is a second generation instrument built for ESO (European Southern
Observatory). The MUSE project is supported by a European consortium of 7 institutes.
After the finalisation of its integration in Europe, the MUSE instrument has been partially dismounted and shipped to
the VLT (Very Large Telescope) in Chile. From October 2013 till February 2014, it has then been reassembled, tested
and finally installed on the telescope its final home. From there it collects its first photons coming from the outer limit
of the visible universe.
This critical moment when the instrument finally meets its destiny is the opportunity to look at the overall outcome of
the project and the final performance of the instrument on the sky. The instrument which we dreamt of has become
reality. Are the dreamt performances there as well?
These final instrumental performances are the result of a step by step process of design, manufacturing, assembly, test
and integration. Now is also time to review the path opened by the MUSE project. What challenges were faced during
those last steps, what strategy, what choices did pay off? What did not?
GRAVITY is a second generation instrument for the VLT Interferometer, designed to enhance the near-infrared astrometric and spectro-imaging capabilities of VLTI. It will combine the AO corrected beams of the four VLT telescopes. The GRAVITY instrument uses a total of five eAPD detectors, four of which are for wavefront sensing and one for the Fringe tracker. In addition two Hawaii2RG are used, one for the acquisition camera and one for the spectrometer. A compact bath cryostat is used for each WFS unit, one for each of the VLT Unit Telescopes. Both Hawaii2RG detectors have a cutoff wavelength of 2.5 microns. A new and unique element of GRAVITY is the use of infrared wavefront sensors. For this reason SELEX-Galileo has developed a new high speed avalanche photo diode detector for ESO. The SAPHIRA detector, which stands for Selex Avalanche Photodiodes for Highspeed Infra Red Applications, has been already evaluated by ESO. At a frame rate of 1 KHz, a read noise of less than one electron can be demonstrated. A more detailed presentation about the performance of the SPAHIRA detector will be given at this conference 1. Each SAPHIRA detector is installed in an LN2 bath cryostat. The detector stage, filter wheel and optics are mounted on the cold plate of the LN2 vessel and enclosed by a radiation shield. All seven detector systems are controlled and read out by the standard ESO NGC controller. The NGC is a controller platform which can be adapted and customized for all infrared and optical detectors. This paper will discuss specific controller modifications implemented to meet the special requirements of the GRAVITY detector systems and give an overview of the GRAVITY detector systems and their performance.
MUSE (Multi Unit Spectroscopic Explorer) is a second generation instrument, built for ESO (European Southern
Observatory) and dedicated to the VLT (Very Large Telescope). This instrument is an innovative integral field
spectrograph (1x1 arcmin2 Field of View), operating in the visible wavelength range, from 465 nm to 930 nm. The
MUSE project is supported by a European consortium of 7 institutes.
After the finalisation of its integration and test in Europe validated by its Preliminary Acceptance in Europe, the MUSE
instrument has been partially dismounted and shipped to the VLT (Very Large Telescope) in Chile. From October 2013
till February 2014, it has then been reassembled, tested and finally installed on the telescope its final home. From there
it will collect its first photons coming from the outer limit of the visible universe.
To come to this achievement, many tasks had to be completed and challenges overcome. These last steps in the project
life have certainly been ones of the most critical. Critical in terms of risk, of working conditions, of operational
constrains, of schedule and finally critical in terms of outcome: The first light and the final performances of the
instrument on the sky.
The Enhanced Resolution Imager and Spectrograph (ERIS) is the next-generation adaptive optics near-IR imager and
spectrograph for the Cassegrain focus of the Very Large Telescope (VLT) Unit Telescope 4, which will soon make full
use of the Adaptive Optics Facility (AOF). It is a high-Strehl AO-assisted instrument that will use the Deformable
Secondary Mirror (DSM) and the new Laser Guide Star Facility (4LGSF). The project has been approved for
construction and has entered its preliminary design phase. ERIS will be constructed in a collaboration including the Max-
Planck Institut für Extraterrestrische Physik, the Eidgenössische Technische Hochschule Zürich and the Osservatorio
Astrofisico di Arcetri and will offer 1 - 5 μm imaging and 1 - 2.5 μm integral field spectroscopic capabilities with a high
Strehl performance. Wavefront sensing can be carried out with an optical high-order NGS Pyramid wavefront sensor, or
with a single laser in either an optical low-order NGS mode, or with a near-IR low-order mode sensor. Due to its highly
sensitive visible wavefront sensor, and separate near-IR low-order mode, ERIS provides a large sky coverage with its 1’
patrol field radius that can even include AO stars embedded in dust-enshrouded environments. As such it will replace,
with a much improved single conjugated AO correction, the most scientifically important imaging modes offered by
NACO (diffraction limited imaging in the J to M bands, Sparse Aperture Masking and Apodizing Phase Plate (APP)
coronagraphy) and the integral field spectroscopy modes of SINFONI, whose instrumental module, SPIFFI, will be
upgraded and re-used in ERIS. As part of the SPIFFI upgrade a new higher resolution grating and a science detector
replacement are envisaged, as well as PLC driven motors. To accommodate ERIS at the Cassegrain focus, an extension
of the telescope back focal length is required, with modifications of the guider arm assembly. In this paper we report on
the status of the baseline design. We will also report on the main science goals of the instrument, ranging from exoplanet
detection and characterization to high redshift galaxy observations. We will also briefly describe the SINFONI-SPIFFI
upgrade strategy, which is part of the ERIS development plan and the overall project timeline.
MUSE (Multi Unit Spectroscopic Explorer) is a second generation instrument built for ESO (European Southern
Observatory) to be installed in Chile on the VLT (Very Large Telescope). The MUSE project is supported by a
European consortium of 7 institutes.
After the critical turning point of shifting from the design to the manufacturing phase, the MUSE project has now
completed the realization of its different sub-systems and should finalize its global integration and test in Europe.
To arrive to this point many challenges had to be overcome, many technical difficulties, non compliances or
procurements delays which seemed at the time overwhelming. Now is the time to face the results of our organization, of
our strategy, of our choices. Now is the time to face the reality of the MUSE instrument.
During the design phase a plan was provided by the project management in order to achieve the realization of the
MUSE instrument in specification, time and cost. This critical moment in the project life when the instrument takes
shape and reality is the opportunity to look not only at the outcome but also to see how well we followed the original
plan, what had to be changed or adapted and what should have been.
MUSE with its 24 detectors distributed over an eight square meter vertical area was requiring a well engineered and
extremely reliable cryogenic system. The solution should also use a technology proven to be compatible with the very
high sensitivity of the VLT interferometer. A short introduction reviews the various available technologies to cool these 24 chips down to 160 K. The first part of the paper presents the selected concept insisting on the various advantages offered by LN2. In addition to the purely vacuum and cryogenic aspects we highlight some of the most interesting features given by the control system based on a PLC.
The 24 IFU from MUSE are equipped with 4K x 4K CCD detectors which are operated at cryogenic temperature around
160 K. The large size of the chip combined with a rather fast camera (F/2) impose strong positioning constrains. The
sensitive surface should remain in an angular envelope of less than 30 arc sec in both directions. The ambitious goal of
having the same spectrum format on every detector imposes also a very accurate positioning in the image plane. The
central pixel has to be located in a square smaller 50 microns relative to the external references.
The first part of the paper describes the mechanical design of the detector head. We concentrate on the various aspects of
the design with its very complex interfaces. The opto-mechanical concept is presented with an emphasis on the
robustness and reliability. We present also the necessary steps for the extreme optimization of the cryogenic performance
of this compact design driven with a permanent view of the production in series.
The techniques and procedures developed in order to meet and verify the very tight positioning requirements are
described in a second part. Then the 24 fully assembled systems undergo a system verification using one of the MUSE
spectrographs. These tests include a focus series, the determination of the PSF across the chip and a subsequent
calculation of the tip/tilt and shift rotation of the detector versus the optical axis.
MUSE (Multi Unit Spectroscopic Explorer) is a second generation instrument developed for ESO (European Southern
Observatory) to be installed on the VLT (Very Large Telescope) in year 2012. The MUSE project is supported by a
European consortium of 7 institutes. After a successful Final Design Review the project is now facing a turning point
which consist in shifting from design to manufacturing, from calculation to test, ... from dream to reality.
At the start, many technical and management challenges were there as well as unknowns. They could all be derived of
the same simple question: How to deal with complexity? The complexity of the instrument, of the work to de done, of
the organization, of the interfaces, of financial and procurement rules, etc.
This particular moment in the project life cycle is the opportunity to look back and evaluate the management methods
implemented during the design phase regarding this original question. What are the lessons learn? What has been
successful? What could have been done differently? Finally, we will look forward and review the main challenges of the
MAIT (Manufacturing Assembly Integration and Test) phase which has just started as well as the associated new
processes and evolutions needed.
In comparison to mechanical cryo-coolers, liquid nitrogen cooling has the double advantage to be free of vibration and to
remain not affected by power failure.
The paper reports about a very compact cryostat using a continuous circulation of liquid nitrogen which is provided from
an external storage tank. Since years, this cryostat is intensively used on the ESO VLT to cool either optical or Infra Red
detectors.
After an introduction presenting the principle, the paper reports the performance of the cryostat recorded over many
years of utilization. We also present a few additional developments which allow the use of the cryostat for more exotic
applications such that Nasmyth rotating instruments or extremely stable radial velocity spectrograph. With the
construction of MUSE, a new era has started for this cryostat. The large multi IFU instrument requires 24 cryostats. The
last chapter of the paper describes this futurist system which is close to completion.
Summary: The Multi Unit Spectroscopic Explorer (MUSE) is a second-generation VLT panoramic integral-field
spectrograph currently in manufacturing, assembly and integration phase. MUSE has a field of 1x1 arcmin2 sampled at
0.2x0.2 arcsec2 and is assisted by the VLT ground layer adaptive optics ESO facility using four laser guide stars. The
instrument is a large assembly of 24 identical high performance integral field units, each one composed of an advanced
image slicer, a spectrograph and a 4kx4k detector. In this paper we review the progress of the manufacturing and report
the performance achieved with the first integral field unit.
REMIR is the NIR camera of the automatic REM (Rapid Eye Mount) Telescope located at ESO-La Silla Observatory (Chile) and dedicated to monitor the afterglow of Gamma Ray Burst events. During the last two years, the REMIR camera went through a series of cryogenics problems, due to the bad functioning of the Leybold cryocooler Polar SC7. Since we were unable to reach with Leybold for a diagnosis and a solution for such failures, we were forced to change drastically the cryogenics of REMIR, going from cryocooler to LN2: we adopted an ad-hoc modified Continuous Flow Cryostat, a cryogenics system developed by ESO and extensively used in ESO instrumentation, which main characteristic is that the LN2 vessel is separated from the cryostat, allowing a greater LN2 tank, then really improving the hold time. In this paper we report the details and results of this operation.
AMBER is the focal near-infrared instrument of the VLTI combining
2 or 3 telescopes in the J, H and K bands with 3 spectral resolution modes. It uses single-mode fibers to ensure modal filtering and high measurement accuracies. AMBER has been integrated and tested in Grenoble during 2003. We report in this paper the lab performances of the instrument in terms of instrumental contrast, measurement accuracy and stability, and throughput.
AMBER, Astronomical Multi BEam combineR, is the near-infrared focal instrument dedicated to the VLTI. It is designed to combine three of the VLTI Telescopes and to work simultaneously in the J, H and K spectral bands (1.0 to 2.4 μm).
The project successfully passed the Preliminary Acceptance in Europe in November 2003, resulting in the validation of the instrument laboratory performance1, of the compliance with the initial scientific specifications, and of the acceptance of ESO for AMBER to be part of the VLTI. After the transportation of the instrument to Paranal, Chile in January 2004, the Assembly Integration and Verification phase occurred mid-March to succeed with the first fringes observing bright stars with the VLTI siderostats.
This paper describes the different steps of the AIV and the first results in terms of instrumental stability, estimated visibility and differential phase.
The instrumentation for VLT/VLTI 1 facility of the European Southern Observatory at Paranal (Chile)includes the infrared beam-combiner called AMBER, that covers the near infrared bands up to 2.5 μm. The cold spectrograph we describe is the AMBER subsystem responsible of wavelength analysis and several other functions, all of them performed by means of optics, analyzers, and mechanisms working at the temperature of liquid nitrogen boiling at atmospheric pressure. The cryo-mechanical design of the spectrograph we describe here
used extensively the methods of finite element analysis and the laboratory tests validated this approach. The final optical quality we measured in the laboratory before shipping the instrument to Grenoble or integration (December 2002),is well inside the specification the AMBER staff assigned to the spectrograph. Simulations show that its total contribution to visibility loss of AMBER is less than 2%.
The paper describes the design of the single conjugate Adaptive Optics system to be installed on the LBT telescope. This system will be located in the Acquisition, Guiding and Wavefront sensor unit (AGW) mounted at the front bent Gregorian focus of LBT. Two innovative key features of this system are the Adaptive Secondary Mirror and the Pyramid Wavefront Sensor. The secondary provides 672 actuators wavefront correction available at the various foci of LBT. Due to the adaptive secondary mirror there is no need to optically conjugate the pupil on the deformable mirror. This allows having a very short sensor optical path made up using small dimension refractive optics. The overall AO system has a transmission of 70 % and fits in a rectangle of about 400×320mm. The pyramid sensor allows having different pupil sampling using on-chip binning of the detector. Main pupil samplings for the LBT system are 30×30, 15×15 and 10×10. Reference star acquisition is obtained moving the wavefront sensor unit in a field of view of 3×2 arcmin. Computer simulations of the overall system performance show the good correction achievable in J, H, and K. In particular, in our configuration, the limiting magnitude of pyramid sensor results more than one magnitude fainter with respect to Shack- Hartmann sensor. This feature directly translates in an increased sky coverage that is, in K band, about doubled with respect to the same AO system using a Shack-Hartmann sensor.
The latest generation of astronomical telescopes is equipped by primary mirrors about 8 meter in diameter increasing demands not only of the general mechanical structure but also of the technical performances of the mirror support systems. The Large Binocular Telescope has two 8.4 meter primary mirrors supported on the same elevation mechanical structure and, each of them, located in a mirror cell enviroment. Into the latter structures hundredth of pneumatic actuators bear the weigth of the primary mirror and six positioning actuators find out the six degrees of freedom of the mirror itself, then a new control system is able to determine realtime the stiffness and the damping required by the primary mirror system. In this paper the authors describe the mechanical and the electronic active control system design and testing of the position actuator prototype that mechanically link the 8.4 m honeycomb mirror to six rigidly reinforced locations on each primary Mirror Cell structure. During telescope operation, the adjustable length of the actuators precisely control the six degrees of freedom of the mirror. Each actuator has a high mechanical axial stiffness and, as new feature, an active control system, based on piezoelectric elements and capacitive sensor, in order to control the axial stiffness versus damping, with a bandwidth from DC up to 50 Hz, assuring that the natural frequencies of the mirror do not degrade the optical performance of the telescope under external forces as the wind spectrum. Moreover, other requirements have been satisfied in the mechanic of the actuators: flexures are provided to minimize any moments applied to the attachment of the actuator to the mirror; one axial load cell for each actuator provides a precise realtime measurement of the external forces applied to the mirror, such as wind loads, to feedback the pneumatic force system that supports the weight of the mirror; a very sensitive and precise capacitive sensor measures the total length of the actuator to submicron resolution upon request. Last but not least each actuator has a reliable fail-safe system that limits the compressive and tensile forces that can be applied to the mirror. The mechanical and the electronic design DSP based and all the experimental tests of this actuator prototype have been performed in the Astrophysical Observatory of Arcetri laboratories under the supervision of the authors of this paper.
Access to the requested content is limited to institutions that have purchased or subscribe to SPIE eBooks.
You are receiving this notice because your organization may not have SPIE eBooks access.*
*Shibboleth/Open Athens users─please
sign in
to access your institution's subscriptions.
To obtain this item, you may purchase the complete book in print or electronic format on
SPIE.org.
INSTITUTIONAL Select your institution to access the SPIE Digital Library.
PERSONAL Sign in with your SPIE account to access your personal subscriptions or to use specific features such as save to my library, sign up for alerts, save searches, etc.