At the start of operations, five instruments will be deployed: a visible broadband imager (VTF), a visible spectropolarimeter (ViSP), a visible tunable filter (VTF), a diffraction-limited near-IR spectropolarimeter (DLNIRSP), and a cryogenic near-IR spectropolarimeter (cryo-NIRSP). At the end of 2017, the project finished its fifth year of construction and eighth year overall. Major milestones included delivery of the commissioning blank, the completed primary mirror (M1), and its cell. Commissioning and testing of the coudé rotator is complete and the installation of the coudé cleanroom is underway; likewise, commissioning of the telescope mount assembly (TMA) has also begun. Various other systems and equipment are also being installed and tested. Finally, the observatory integration, testing, and commissioning (IT&C) activities have begun, including the first coating of the M1 commissioning blank and its integration within its cell assembly. Science mirror coating and initial on-sky activities are both anticipated in 2018.
As of mid-2016, the project construction is in its 4th year of site construction and 7th year overall. Major milestones in the off-site development include the conclusion of the polishing of the M1 mirror by University of Arizona, College of Optical Sciences, the delivery of the Top End Optical Assembly (L3), the acceptance of the Deformable Mirror System (Xinetics); all optical systems have been contracted and are either accepted or in fabrication. The Enclosure and Telescope Mount Assembly passed through their factory acceptance in 2014 and 2015, respectively. The enclosure site construction is currently concluding while the Telescope Mount Assembly site erection is underway. The facility buildings (Utility and Support and Operations) have been completed with ongoing work on the thermal systems to support the challenging imaging requirements needed for the solar research.
Finally, we present the construction phase performance (schedule, budget) with projections for the start of early operations.
In this paper we describe the ongoing planning of the Integration, Testing and Commissioning (IT&C) phase of the project in particular the detailed planning phase that we are currently developing.
View contact details
No SPIE Account? Create one